Servers sitting in liquid: a real market, measured six different ways.
The fluid that cools servers by submerging them is a genuine and growing chemical market. The published estimates of its size disagree widely, partly because they do not count the same thing. Here is what the public record says, and what a chemical supplier should ask before believing any of it.
By Dr. James S. Puckace
Founder, Bluetigre Consultants LLC · 28 September 2026
What the market is
Most servers are cooled by blowing air across them. In immersion cooling, the whole server sits in a tank of fluid that does not conduct electricity, and the fluid carries the heat away. There are two kinds. In single-phase systems the fluid stays liquid and is pumped through a heat exchanger; these fluids are mineral oils, synthetic hydrocarbons and similar. In two-phase systems the fluid boils on the hot chip and condenses again above it; these have mostly been fluorinated fluids.
One report adds a third thing to the count. The research firm that puts the fluid market at USD 1.8 billion names transformers, not data centres, as the largest end use (MarketsandMarkets, December 2023). So when you see a figure for "immersion cooling fluids", the first question is whether it includes the oil inside electrical transformers.
Who buys it
The published reports name the same few buyers: operators of large data centres and high-performance computing, cryptocurrency miners, and smaller computing sites at the edge of networks (MarketsandMarkets, September 2026). One report names a cryptocurrency boom as the headline driver of the fluid market (The Business Research Company, September 2026). None of the summaries we could read says who signs off on the fluid itself, which is the question that matters most to a supplier.
How big, as the sources state it
These are the figures as each source published them. We have not produced a figure of our own, and we have not averaged them.
| Who said it, and when | What they counted | Size | Growth stated |
|---|---|---|---|
| Strategic Market Research, December 2025 | Fluids, global | $1.65bn (2024) to $3.29bn (2030) | 12.1% a year, 2024‑2030 |
| MarketsandMarkets, December 2023 | Fluids, global, including transformers | $1.8bn (2023) to $3.2bn (2030) | 8.2% a year, 2023‑2030 |
| The Business Research Company, September 2026 | Fluids, global, including transformers, EV batteries and solar panels (no split given) | $2.2bn (2025); $2.42bn (2026) to $3.48bn (2030) | 9.5% a year, 2026‑2030 |
| Global Market Insights, September 2026 | Fluids, global, including transformers and EV batteries; data centres alone $0.70bn of $2.6bn in 2026 | $2.4bn (2025); $2.6bn (2026) to $5.2bn (2035) | 8.2% a year, 2026‑2035; data centres 8.7% |
| Mordor Intelligence, updated 11 September 2026 | Fluids, global | $2.54bn (2025); $2.79bn (2026) to $4.49bn (2031) | 9.98% a year, 2026‑2031 |
| MarketsandMarkets, 15 September 2026 | The whole cooling system (tanks, hardware, services), not the fluid alone | $0.74bn (2026) to $5.78bn (2033) | 31.5% a year, over the forecast period |
All figures in US dollars, as stated by the named firm. Each is a summary published by a company that sells the full report.
Two things stand out. The four fluid estimates for 2024 and 2025 run from $1.65 billion to $2.54 billion, and the five fluid estimates state growth of between 8.2% and 12.1% a year, each over a different period. The fastest number in the table, 31.5%, is for the equipment, not the fluid, and should never be quoted as a fluid growth rate.
What is pulling it
- Data centres are using far more electricity. US data centres used about 4.4% of the country's electricity in 2023 and are expected to use roughly 6.7% to 12% by 2028 (US Department of Energy, reporting Lawrence Berkeley National Laboratory, 20 December 2024). Worldwide, data centres used around 415 terawatt-hours in 2024, set to more than double to around 945 by 2030 (International Energy Agency, Energy and AI, 2025).
- Hotter, denser racks. One report names racks that draw more than 30 kilowatts, and very large AI sites, as reshaping the economics of cooling (Mordor Intelligence, September 2026).
- Efficiency rules. The same report names pressure to cut energy overhead as a driver, and says Singapore now requires new sites to meet a strict efficiency limit (same Mordor Intelligence page).
- Selling the heat. One report names programmes that sell waste heat into district heating as a driver (Mordor Intelligence, September 2026).
What stands in the way
- Fluorinated fluids are under pressure. 3M, a major maker, committed to stop making the "forever chemicals" family known as PFAS, fluorinated fluids included, by the end of 2025 (3M, 20 December 2022). In Europe, a proposal from five national authorities to restrict the whole family was submitted in January 2023 and updated in August 2025; at that update it was still with the European Chemicals Agency's scientific committees (European Commission, August 2025).
- Seals and fit. One report names hydrocarbon fluids attacking some rubber seals, and a lack of common standards across equipment makers, as brakes on adoption (Mordor Intelligence, September 2026).
What a chemical supplier should ask
1. Does the figure I am being shown include transformer oil? If it does, the largest single part of it may not be a data-centre sale.
2. Single-phase or two-phase? They are different chemistries, different customers and different rules.
3. Who qualifies the fluid: the tank maker, the server maker or the operator? That is who you sell to first.
4. Will my fluid leave every seal, cable jacket and label in the tank as it found them, for the life of the server?
5. If the European restriction lands, does my product get stronger or weaker?
What we could not find. No government statistic that counts this fluid on its own; no public price per litre. Only one seller separates data-centre fluid from transformer oil: Global Market Insights puts data centres at $0.70 billion of $2.6 billion in 2026, against $1.22 billion for transformers (September 2026). We could not open the Grand View Research report, so its figures are not included. The Uptime Institute's 2025 survey of data centres sits behind a sign-up, and its public page gives only a short summary, so we have not quoted its figures on how hot server racks run. We could not open the European Chemicals Agency's own page either, so where the restriction stands is taken from the European Commission's summary.
We report size and growth only as the sources state them, with the year, the region and who said it. We do not produce a market size of our own, and a well-documented market is not the same as an attractive one.